Seaway Docks
Terminal Supervisor: | John Hazley | |
(979) 237-6756 | ||
Terminal Operations: | (979) 237-6752 | |
Total Number of Docks: | 3 | |
Dock #1 | Fuel barge berth | |
Dock #2 & #3 | Made for vessels 500 feet to 820 feet LOA. Maximum Draft alongside is 42 feet |
|
Dock #2 | Vessels discharging cargo usually berth port side. Vessels loading cargo berth starboard side. |
|
Dock #3 | Vessels berth starboard to. | |
Recommended mooring arrangement: | 3 Head lines/Stern lines 2 Breast lines forward and aft 2 Spring lines forward and aft |
|
Tug Requirements: | 2 house tugs for vessels discharging cargo 3 tugs required for Aframax vessels arriving in ballast docking starboard side (see tug page) |
|
Total of 3 loading arms on each dock. Usually only 2 loading arms are connected. Each loading arm is 16 inches in diameter. |
||
Shore side gangway is provided. Total length of dock is 1000 feet. |